The Group integrated BIM, GIS, and digital twin technologies to build Four Predictions (forecasting, warning, drill, and planning) system for river basins, enabling real-time interaction between physical river basins and digital models.
The project improves scientific decision-making capabilities for flood control dispatching, increases early warning response speed by 60%, provides smart solutions for urban flood prevention and disaster reduction, and is included in the Ministry of Water Resources' list of typical cases for new infrastructure construction.